You have commented 375 times on Rantburg.

Your Name
Your e-mail (optional)
Website (optional)
My Original Nic        Pic-a-Nic        Sorry. Comments have been closed on this article.
Bold Italic Underline Strike Bullet Blockquote Small Big Link Squish Foto Photo
Science & Technology
Royal Navy nuclear submarine equipped with Trident missiles 'suffered huge malfunction that sent the vessel into an endless dive - with engineers saving the 140 crew members moments before they faced being crushed by underwater pressure'
2023-11-21
Remember when the British navy ruled the seas? Sadly, this is not that navy.
[Daily Mail, where America gets its news] A Royal Navy nuclear submarine equipped with Trident missiles suffered a huge malfunction that sent it into an endless dive before the vessel was righted moments before the crew faced being crushed by underwater pressure, it was claimed today.

The Vanguard class sub had been carrying 140 crew when its depth gauge suddenly failed while on a mission in the Atlantic.

It caused a frantic scrabble with engineers managing to stop the submarine and its nuclear reactor from plunging further just moments before disaster struck.

The deep sea vessel, carrying Trident 2 missiles, was on patrol when the depth indicators stopped working, with its crew falsely believing it was level when in fact it was diving deeper into the ocean.

It was only when engineers at the back of the sub found a second gauge indicating they were headed towards the 'danger zone' that they sounded the alarm.

'It's not the engineers' job to control the sub's depth but they saw how deep they were and realised something was wrong,' a source told The Sun.

In January, defence chiefs launched an urgent investigation after workmen allegedly used glue to repair broken bolts inside a nuclear reactor chamber onboard HMS Vanguard.

The unsuitable repairs to the bolt heads, which had sheared off after being over-tightened, were discovered during a routine check aboard the sub, according to The Sun.

Repair work was being undertaken as part of a dry dock refurbishment at HMNB Devonport in Plymouth, which is behind schedule by four years and £300million over budget.

Defence Secretary Ben Wallace is said to have demanded 'assurances about future work' carried out on the 15,900-ton vessel by established contractor Babcock following the discovery.
Related:
Vanguard class sub: 2017-04-26 Russia sez: After Its Nuclear Attack, the UK Would be 'Wiped Off the Face of the Earth'
Posted by:Skidmark

#10  comments); ?>werwer
Posted by: magpie   2023-11-21 14:13  

#9  comments); ?>werwer
Posted by: Skidmark   2023-11-21 12:11  

#8  comments); ?>werwer
Posted by: SteveS   2023-11-21 11:39  

#7  comments); ?>werwer
Posted by: M. Murcek   2023-11-21 10:46  

#6  comments); ?>werwer
Posted by: EMSArtifact   2023-11-21 10:43  

#5  comments); ?>werwer
Posted by: AlmostAnonymous5839   2023-11-21 09:10  

#4  comments); ?>werwer
Posted by: Skidmark   2023-11-21 08:47  

#3  comments); ?>werwer
Posted by: Super Hose   2023-11-21 08:17  

#2  comments); ?>werwer
Posted by: Skidmark   2023-11-21 07:59  

#1  comments); ?>werwer
Posted by: USN, Ret.   2023-11-21 07:46  

00:00