| Submit your comments on this article |
| Home Front: WoT |
| New Carrier Unlikely to Meet Aircraft Goals |
| 2014-01-22 |
| Defense Secretary Chuck Hagel was warned last month that the U.S. Navys new aircraft carrier, the most expensive warship ever built, is unlikely to meet its goal for handling aircraft. The USS Gerald R. Fords sortie generation rate -- the ability to launch and recover aircraft -- is based on unrealistic assumptions, and key launching systems are currently suffering from development problems and have poor or unknown reliability, Pentagon Director of Operational Testing Michael Gilmore told Hagel in a Dec. 9 memo. I am transmitting this report to you because it deals with a high-visibility program, and it is likely Congress will request copies, Gilmore wrote. He attached a 30-page report outlining his early operational assessment of the CVN-78 program, which calls for spending at least $40 billion to develop and build three carriers. The Navy has said the new carrier promises about a 25 percent increase in sortie generation over the current Nimitz class. The Ford, already the most expensive warship ever built, is projected by the Navy to cost $12.8 billion in current dollars, 22 percent more than estimated five years ago. Adjusted for inflation, the cost is closer to $13.9 billion, said the Congressional Budget Office. The memo will likely form part of the context for Congress consideration of the fiscal funding request for the CVN-78 program, said Ronald ORourke, a naval analyst for the nonpartisan Congressional Research Service. Navy program documents indicate that the service intends to request about $2.6 billion for the program next year, up about $1 billion from the current years request. The poor reliability of critical subsystems -- such as the new electromagnetic catapult system, advanced arresting gear, dual-band radar and weapons elevators for moving munitions to the flight deck -- will be the most significant risk to the carriers success in combat testing and deployment, Gilmore said. Both the assessment sent to Hagel and an upcoming annual report on weapons testing highlight poor or uncertain reliability currently demonstrated by critical new technologies, Gilmore spokeswoman Jennifer Elzea said in an e-mail statement. A section of Gilmores report obtained by Bloomberg News said the Navy to date has conducted limited reliability testing of these systems. If the reliability problems are not solved and drive CVN-78s sortie generation rate well below that of the current Nimitz class carriers, the result could be significant to strategic planners assessing wartime needs, Gilmore wrote. The Navy plans for Ford-class carriers to launch and recover 160 aircraft a day over a sustained period and 270 during a wartime surge; the Nimitz-class requirement is 120 a day and 192 during a surge. |
| Posted by:Steve White |
| #5 |
| Posted by: KBK 2014-01-22 19:23 |
| #4 |
| Posted by: Glenmore 2014-01-22 12:32 |
| #3 |
| Posted by: JFM 2014-01-22 06:44 |
| #2 |
| Posted by: Shipman 2014-01-22 05:11 |
| #1 |
| Posted by: USN, Ret. 2014-01-22 01:12 |